Journal of Petroleum Technology June 2012 : Page 9

Production accelerated. Tiandi turns months into days. ( BOE / DA Y ) How? With a virtual army of experienced reservoir engineers, geologists, petrophysicists, geophysicists, data management engineers, digitization techs and other engineering specialists. All full-time employees. Ready to accelerate your results. Tiandi is different. By thinking outside the box, we were able to come up with the game-changer. Now you can accelerate production like the 85+ major projects we’ve completed in the past 18 months. From the U.S. to Europe and South America, our customers include supermajors, NOCs, U.S. and European Independents and major service companies. How about you? PRODUCTION MONTHS Field Studies Accelerated O Data Management Accelerated O North Sea: Seismic to Simulation complete workflow (101 days) Permian: Waterflood injection redesign, mature field (58 days) Fayetteville: Complete geo-model and history match (118 days) Kern River: Heavy oil reservoir and multiple development scenarios (63 days) California: 25,000 wells from paper to OpenWells (210 days) Fayetteville: 4,320 wells from PDF to Petrel and Recall (124 days) Anadarko Basin: 2,365 wells from Raw LAS to Composite Logs to Petra (61 days) Colorado: 1,701 wells from core images to iPoint (47 days) O O O O O O Production Accelerated tiandienergy.com | 1-713-487-6546 | Houston Calgary London Bakersfield

Tiandi Energy Inc.

Using a screen reader? Click Here